The Team

Kevin Du Priest
CEO & Engineer
Kevin has 35 years combined experience as a systems engineer for energy, defense, and aerospace. A data analyst and scientist has spend the past 6 years reviewing NASA data which has prepared him for this project. He has engineered 14 subsystems and has patents for zero gravity in-situ resource utilization equipment.

Goncalo Esteves
Systems Engineer
Goncalo has experience in Industrial Engineering and Management with Commercial Space Studies and 15 years of Business Process improvement. He is a practitioner of Krav Maga, and says that working in space is similar to his practice as both present tests and deployment that are unforgiving.

Ted Miller
Geologist
Ted is a terrestrial mining geologist with lunar ambitions. For this project he is designing the rover test track and mining simulant. He has always been fascinated by the cutting edge of technology and is excited to contribute to forefront of space exploration through this project.

Thomas Pech
Software Engineer
Tom is a Robotics Software Engineer working on autonomous construction equipment and other mobile robots. He believes that the development of space infrastructure is incredibly important to the trajectory of our species, and autonomy will play a critical role due to the harsh environments that make human labor impractical.

John Oldland
Mechanical Engineer
John is a business conscious engineer who excels at connecting non-technical and technical disciplines with excellence and simplicity. A Colorado School of Mines graduate Mechanical Engineering and Engineering Physics. Published Paper: “Design and Fabrication of a Formula SAE Undertray”

Anthony Mitine
Mechanical Engineer
Anthony is a first year student in Mechanical Engineering and minoring in Machine Learning & Neural Computation at the University of California, San Diego. He is excited by the design of devices and machines that can solve modern day problems which is what lead him to this team.
Join Us
Dec 19, 2022 – Help us launch. We are looking to expand and explore these new ventures and need your help.
- Company Offices and Assembly Warehouse
- ~10,000 to 20,000 sq ft open floor high ceiling secure warehouse.
- Fabrication Rapid Prototyping Makers Laboratory – open to Joint Venture Partnership
- Access to a large format 3D printer for metal and carbide parts.
- 3-axis CNC machines, computer-controlled subtractive milling and turning machines
- Printed circuit board milling or etching high precision milling in pre-clad copper boards
- Microprocessor and digital electronics design, assembly, and test workstations
- Cutters, for sheet material: laser welder, plasma cutter, water jet cutter
- New Hire Employees (US applicants only, msg us your LinkedIn profile)
- Robotic / Electrical Engineer –
- Robotic Software Programmer –
- Equity Investment Partner
- Visionary early-stage partner to support our short-term deliverables.
- Long term ROI, mining, energy, construction market penetration.
DEFINED PRODUCT, TIGHT BUDGET, TIGHT SCHEDULE, NO WASTE
Contact Us
Have a question or want to get involved? Reach out, we’d love to hear from you!